Precinct Brief

Overview

Up to four scenarios in one council, side by side against the targets planners answer to, with a method appendix. Use it for a council briefing, a studio review or a paper. It holds measured results only: nothing in it is AI-written.

Open it from Analysis → Precinct brief.

What It Compares

MeasureWhat the brief showsTarget or benchmark
HousingNet new homes on the sites (Existing − Lost + New), and their share of the council's targetPlan for Victoria's housing target for the council, net new homes to 2051
20-minute neighbourhoodThe score, and the criteria met of those measuredPlan Melbourne's 20-minute neighbourhood hallmarks
Tree canopyThe existing canopy on the sites, and the planting Clause 55/58's canopy standard asks forPlan for Victoria's 30% canopy aim
EquityThe need groups above the Victorian share, the area's SEIFA (IRSD) decile, and the priority provisions metWhat those groups need first
Social and affordable homesTheir share of the new homes, as the design states them10% (Clause 53.23)

Making One

  1. Choose up to four scenarios in the same council. The scenario you're in is chosen already.
  2. The brief reads each scenario's saved results. If a result is missing or out of date (the sites or the model changed since it ran), it's listed. Run the missing ones first runs them in order, so Social Equity runs after the models it reads.
  3. Give it a title and Make the brief. It's kept as a PDF and a read-only link you can turn off. Making one needs an account.

How to Read It

  • A share of the target is how much of the council's whole target to 2051 these sites would deliver. A precinct is usually a small share, often under 1%.
  • Net new homes are unknown where the homes already on a site aren't known. The brief then shows the new homes and says so.
  • Tree canopy is the canopy there now, not a forecast once the planting grows.
  • Equity isn't one index. It's who lives in the area and what the precinct provides for them.
  • Not run means there was no current result for that scenario when the brief was made.

Limits

  • It's a first screen against the targets, not a planning assessment, a housing capacity study or advice.
  • The 20-minute criteria that can't be measured (local jobs, safe cycling, and walkable streets where the street network can't be read) are listed and not counted. Scores built on different measured sets aren't the same test.
  • One council per brief: scenarios in different councils answer to different targets.

Sources

SourceUsed forLicence
Plan for Victoria, Department of Transport and PlanningHousing targets by council, net new homes to 2051CC BY 4.0
The models' own sources20-minute neighbourhood, tree canopy, equity, housing balanceSee each model's page